![Loading Events](https://stmikes.utoronto.ca/wp-content/plugins/the-events-calendar/src/resources/images/tribe-loading.gif)
Loretto College Development Survey
In January 2024, USMC purchased the Institutional Parcel for Loretto College, conditional upon the completion of sale of the Residential Parcel for development as a condominium. USMC will continue to maintain and manage the building and are working with an architect to develop a statement of requirements to inform the RFQ for a developer. Currently, the location has been rezoned and approved for a 40-storey mixed institutional/residential use building and, once re-developed, USMC will resume operation of the residential portion of the building. We anticipate that the current building will not be demolished for another 3 years.
In preparation for the new build, we want to hear your thoughts, which will shape the design and programming of the space. Please take a moment to complete our survey: https://stmikes.utoronto.ca/shaping-the-future-of-the-new-loretto-college